Tender Notice for Floodlighting Project of the First Phase of Suzhou Research Institute of Southeast University

Project Name: Southeast University Suzhou Research Institute Phase I Floodlighting Project Tender Notice Bidding Start Deadline: March 7, 2008 Region: Jiangsu Province Project Bidding Details: 1. Suzhou Industrial Park Education Development Investment Co., Ltd. The first phase floodlighting project of Suzhou Research Institute of Southeast University has been approved by the Bureau of Development. The source of funds required for the project is self-raised and has been implemented. Currently, qualified potential bidders are invited to participate in the project. Prequalification.

2. Project Overview

(1) Project Location: Dushu Lake Higher Education District

(2) Project scale: The total construction area is about 40,000 square meters, which is divided into 5 units, which is the lighting of the building. The total investment is about 1 million yuan.

(3) Planned opening and completion time: started in March 2008, completed in May 2008

3. This tender project is divided into several tender sections.

4. Applicants must have the necessary qualifications for prequalification

(1) The ability to independently conclude a contract;

(2) The enterprise has not been ordered to suspend business, the bidding qualification has been cancelled, or the property has been taken over, frozen and bankrupt;

(3) The enterprise has not been suspended by the relevant departments for the purpose of defrauding the winning bid or serious breach of contract and major engineering quality and safety production accidents, and is within the suspension period;

(4) Applicant qualification category and level: Urban and road lighting engineering professional contractor level and above qualifications

(5) The qualification level of the project manager to be selected is: 叁 level and above; and the project leader is responsible for the safety production assessment certificate (B);

(6) Enterprise performance and reputation: good; in the past two years, the performance of the floodlighting project with a single contract amount of more than 1 million yuan (excluding the performance of street lighting projects)

(7) The performance and reputation of the proposed project manager: good; in the past two years, the performance of the floodlighting project with a single contract amount of more than 1 million yuan (except for the performance of street lighting projects)

(8) The important contents of the pre-qualification application are not inaccurate or fraudulent;

(9) The enterprise has safe production conditions and has obtained a safety production license;

(10) The project manager has no construction in progress, or although there are projects under construction, all construction tasks within the scope of the contract are nearing the completion stage, and the application for completion acceptance has been submitted to the original contractor, and the original contractor agrees to participate in other projects. Bidding competition for the project;

(11) The bidding applicant must apply for the bidding and qualification examination by the legal representative of the enterprise (or the agent represented by the legal representative), and the entrusted agent must be the employee of the enterprise;

(12) The enterprise needs to have independent legal personality;

(12) The tenderee refuses to bid for the applicants of the park construction unit for the other types of bad credits identified by category c or the Suzhou Industrial Park Planning and Construction Department;

(14) Other conditions stipulated by laws and regulations.

5. Applicants are requested to arrive at the tangible market on the 2nd floor of Market Building, No.168 Wangdun Road, Suzhou Industrial Park, from 9:30 am to 11:00 am, and from 2:30 am to 4:30 pm on March 7, 2008. Sign up and submit a prequalification application.

The following original information is required:

(1) The original identity document of the applicant's identity document, the legal representative's power of attorney (the agent must be the employee of the enterprise), the original employee's agency guarantee or the original labor contract;

(2) The original project manager qualification certificate;

(3) The original copy of the business license and the original certificate of qualification;

(4) The original of the enterprise safety production license and the original certificate of the project manager (B) safety production assessment certificate;

(5) The original financial statement (balance sheet, cash flow statement, profit and loss statement) of the company in the past two years.

(6) In the past two years, the enterprise and project manager have undertaken the original contract of the floodlighting construction performance (excluding streetlights) with a single contract amount of 1 million yuan or more, the original completion acceptance report, the successful bidding notice or the direct delivery notice. The three are indispensable.

The prequalification application is packed into a book in the following order and must be stamped with the official seal:

(1) The identity document of the applicant, the power of attorney of the legal representative, the copy of the guarantee of the employee or the employee of the unit;

(2) Company profile;

(3) A copy of the business license and qualification certificate;

(4) The staffing situation of the project to be invested in the project;

(5) A copy of the project manager qualification certificate;

(6) A copy of the enterprise safety production license and a copy of the project manager (B) safety production assessment certificate;

(7) A copy of the financial audit statements (balance sheet, cash flow statement, profit and loss statement) of the company in the past two years;

(8) A list of similar completed and under construction projects of the enterprise and the proposed project manager in the past two years, including time, place, owner, cost, scale and quality;

(9) In the past two years, the enterprise and project manager have undertaken a copy of the contract for the construction of the floodlighting with a single contract amount of 1 million yuan or more (excluding the streetlights), a copy of the completion acceptance report, a notice of winning the bid or a notice of direct delivery. A copy of the book.

(10) The situation of the company to be subcontracted;

(11) The project manager shall have no construction in progress, or there may be construction in progress, but all construction tasks within the scope of the contract are nearing the completion stage, and the application for completion acceptance has been submitted to the original contractor, and the original contractor agrees to participate in the other Proof of bidding competition for the project;

(12) A statement that the company has no falsified content on the information provided;

The above information must be provided with the original and a valid copy. The originals must be kept for reference during the registration. The photocopies must be bound into a booklet and stamped with the official seal. Otherwise, the tenderee has the right to refuse to accept the registration. The completeness of the information provided is a prerequisite for the passing of the pre-qualification.

6. Prequalification method: random lottery

There are less than 9 qualified pre-qualification units, all of which are short-listed; if there are no less than 9 qualified pre-qualification units, 9 or more units will be determined to participate in the bidding through random drawing.

7. Tenderee Address: Dushu Lake Higher Education District Comprehensive Building, District 1 Park Education Development Investment Co., Ltd.

Contact: Yuan Xiaotong

fax

phone

8. Suzhou Industrial Park bidding complaint telephone

FT06 Series Fused Terminal Connectors